|
|
Using the sludge hammer was fun. There was
a ton of deprise I had to throw out. |
Glass block installed in the tub. |
 |
 |
Completely new electrical going in. I lot of
new switches. |
I had to run slightly re-route some plumbing
lines. |
 |
 |
Tub removed. that was hard as hell. |
Some of the sub-floor needed replacing. |
|
|
|
The new tub is under the plywood (used for
protection) and the installation is there to keep things warm.
|
Durarock on the floor ready for tile installation.
|